Beech in the sun
The sun is out and the two storey south block is almost in the dry with roof waterproofing going on. The trusses on the North side are being craned into position. The site is busy today with architects visit, health and safety inspections, meetings with Zinc roofers, crane lifting, carpentry, and continuous progress.