Shining in the sun

The steelwork has been fixed and levelled and the galvanised finish catches the sun. The building is starting to feel three dimensional as it lifts from the ground. Service ducts can be seen coming into the building and blockwork loaded ready for the floor. And it's staying dry!

24AB9E18-7395-4ABC-AB93-A19153E39592.png
Previous
Previous

Dawn

Next
Next

Team Expertise-Paul