Plynth
Built off of the foundations concrete blockwork forms the plynth for the timber frame on the south part of the building which is cut into the ground. Drainage is being set out and will be hidden under the structural floor. Pads are being formed to hold the beech truss post bases. Everything is being done extremely accurately so that the factory made frame will fit when it is delivered to site.